ASTROMAGNET Request a Quote

ENGINEERING RESOURCE / RFQ SUPPORT

Sampling and Approval for Custom Magnet Projects

A project-stage guide for separating engineering review, quotation, sample discussion, approval and production.

ASTROMAGNET ENGINEERING RESOURCE / RFQ SUPPORT DRAWING / APPLICATION / RELEASE

PROJECT BASIS

Keep the useful details together.

Understand how custom magnet samples, customer approval and production release fit into a drawing-led NdFeB project.

01 / ENGINEERING RESOURCE / RFQ SUPPORT

A clear project sequence

Drawing, specification and application context are reviewed.

Commercial scope follows the agreed technical basis.

Availability and scope are determined case by case.

Production follows customer confirmation and approval of the agreed drawing and specification.

  • 01
  • Engineering review
  • 02
  • Quotation
  • 03
  • Sample discussion
  • 04
  • Approval to production

02 / ENGINEERING RESOURCE / RFQ SUPPORT

Samples are project-dependent

Sample availability is determined case by case. Samples are not described as free, and timing is confirmed against the actual project basis rather than promised universally.

03 / ENGINEERING RESOURCE / RFQ SUPPORT

Approval closes the specification loop

The approved drawing, specification and sample status should remain connected to production and inspection records.

04 / ENGINEERING RESOURCE / RFQ SUPPORT

Planning a sample review?

Share the drawing, quantity, approval criteria and target timing for a project-specific discussion.

  • Discuss Sampling

CONTINUE THE REVIEW

Move to the next useful step.

Use the related route that matches the information you already have.

ENGINEERING HANDOFF

Share the project basis you have.

Send the drawing, application context and commercial inputs available today. Open questions can be clarified during review.

Discuss Sampling
PROJECT BASISPDF / STEP / STPAPPLICATION / MATERIAL / RELEASE