DRAWING-LED ENGINEERING SERVICE
Custom NdFeB Magnets From Drawing Review to Production
A custom magnet starts before production. It starts with a drawing, a useful description or a physical sample that gives the engineering review something specific to hold.
See the review basisTHE REVIEW ROUTE
The drawing carries the decisions.
01 / ENGINEERING INPUTS
Make the unknowns visible.
The best first exchange puts the application, material, geometry and use context beside one another. The review can then identify what is defined and what still needs a decision.
- 01ApplicationWhat the magnet must do, and the environment around the assembly.
- 02MaterialGrade, temperature context and the performance target already known.
- 03DimensionsKey sizes, tolerances, recesses, holes and finished condition.
- 04SurfaceCoating or corrosion context, including any required finish.
- 05MagnetizationPole direction and the relationship to the working assembly.
- 06UsageSample need, annual usage and delivery context for the enquiry.
FROM INPUT TO PRODUCTION
A drawing-led route with a clear handoff.
The sequence is straightforward. The decisions inside it are confirmed project by project, with the approved drawing and specification staying at the center.
- 01Drawing / specification
PDF, STEP, STP, written description or an available physical sample.
- 02Engineering review
Geometry, material, coating, magnetization and use conditions are read together.
- 03Quotation
Manufacturability, quantity and timing are discussed against the project basis.
- 04Sample
Sample availability and the approval route are confirmed for the project.
- 05Customer approval
The agreed requirement becomes the reference for production.
- 06Production
Manufacturing and inspection follow the approved basis and release context.
02 / PROJECT VARIABLES
Connected decisions.
Industry grade range used as a project input, subject to the approved specification.
Typical tolerance reference for common dimensions; tighter values require project review.
Nickel, zinc, epoxy or phosphating can be reviewed against corrosion context.
Axial, diametric, radial or customer-required magnetization stays with the drawing.
03 / RELEASE BASIS
A useful handoff is specific.
Manufacturability, tolerance, sample availability, quantity and timing are confirmed project by project. The approved drawing and specification remain the reference for production and inspection.
- Input
- PDF, STEP, STP, written description or physical sample.
- Review
- Application, geometry, material, surface and magnetization context.
- Evidence
- Inspection records and the final approved requirement stay beside the part.
NEXT USEFUL INPUT
Send the drawing when ready.
Use the structured RFQ to keep your application, geometry and requirement together. Attach the drawing in your email client after the summary is prepared.
Start a drawing reviewGEOMETRY
REQUIREMENTREVIEW / QUOTE / SAMPLE / PRODUCTION